Electrical Cert Schd Load 18a2¶
Generated page — confirm before relying on it
Written automatically from the Versaa export of 20/08/2026. It has not been reviewed by anyone, and it describes what was exported on that date — not what is in Management Studio right now.
Version numbers are deliberately omitted. The export filename does not reliably identify the active version and can carry a Test or Live record, so any number here would be untrustworthy. Check the version in Management Studio.
Purpose¶
The Electrical Cert Schd Load 18a2 workflow is designed to manage the loading of electrical certification schedules based on specific events. It is triggered by messages related to loading electrical edit schedules, such as EICR and installation schedules. The outcome of this workflow is the successful loading of the relevant schedule files into the system for further processing.
Key Steps¶
- Check for the triggering event to determine the appropriate action.
- Load the list of EICR schedule files.
- Load the list of installation files.
- Handle unknown events by updating the user status.
- Fill tasks with EICR schedules based on the loaded data.
- Fill tasks with installation schedules based on the loaded data.
Notes¶
No special notes.
Raw Export¶
Versaa_Exports_md/workflows/Electrical_Cert_Schd_Load_18a2_0.md