Electrical Cert Defaults Load¶
Generated page — confirm before relying on it
Written automatically from the Versaa export of 20/08/2026. It has not been reviewed by anyone, and it describes what was exported on that date — not what is in Management Studio right now.
Version numbers are deliberately omitted. The export filename does not reliably identify the active version and can carry a Test or Live record, so any number here would be untrustworthy. Check the version in Management Studio.
Purpose¶
The Electrical Cert Defaults Load workflow is designed to manage the loading of default settings for electrical certification processes at Lincolnshire Housing Partnership. It is triggered by specific messages related to loading electrical edit defaults. The outcome of this workflow is the successful loading of various default lists, ensuring that the system is updated with the latest configurations for electrical certifications.
Key Steps¶
- Check for the triggering event related to electrical edit defaults.
- Load the EICR schedule file list.
- Load the installation file list.
- Load the main defaults list.
- Remove any existing user defaults.
- End the workflow process.
Notes¶
No special notes.
Raw Export¶
Versaa_Exports_md/workflows/Electrical_Cert_Defaults_Load_2.md