Skip to content

Electrical Edit Defaults 18a2

Generated page — confirm before relying on it

Written automatically from the Versaa export of 20/08/2026. It has not been reviewed by anyone, and it describes what was exported on that date — not what is in Management Studio right now.

Version numbers are deliberately omitted. The export filename does not reliably identify the active version and can carry a Test or Live record, so any number here would be untrustworthy. Check the version in Management Studio.


Purpose

The Electrical Edit Defaults 18a2 form is designed to facilitate the collection and management of electrical inspection and installation data within Lincolnshire Housing Partnership. It supports the business process of ensuring compliance with electrical safety standards and regulations, specifically the BS7671 guidelines. This form is typically used by electricians, contractors, and compliance officers involved in electrical assessments and installations.

Key Fields

  • BS7671 Amendment Date
  • Contractor Name
  • Client Name
  • Client Address 1
  • Client Postcode
  • ELE Electric shock protective measures Default
  • ELE Inspect Previous insp known
  • ELE Recommended next inspection SEL
  • ELE Supply Overcurrent prot dev rated curr Sel
  • ELE System type
  • ELE Earth electrode type SEL
  • ELE Earth conductor continuity
  • ELE Inspect Extent of inst reported
  • ELE Installation comments
  • Enable document preview
  • Include schedules in observations

Notes

No special notes.


Auto-derived from the artefact relationship graph (data/dependency_graph.json).

Raw Export

Versaa_Exports_md/forms/Electrical_Edit_Defaults_18a2_0.md